2025 Yamaha XSR 155 Launched – Price, Specs, Mileage, Features, and Review

Image
  🏍️ 2025 Yamaha XSR 155 – Retro Styling Meets Modern Performance ✅ Updated on November 13, 2025: Yamaha has officially launched the XSR155 in India at ₹1,49,990 (ex-showroom), bringing a perfect blend of retro design and modern performance. 🏁 Introduction: A Modern Retro from Yamaha Yamaha has finally unveiled the 2025 XSR 155 , a motorcycle that merges classic retro looks with modern technology . Inspired by the brand’s “Neo-Retro” design philosophy, the XSR 155 continues to attract riders who love vintage aesthetics without compromising on performance. In this article, we’ll explore the Yamaha XSR 155’s 2025 model in depth — covering its price, mileage, features, engine specs , and everything else you need to know before buying. ⚙️ 2025 Yamaha XSR 155 Specifications and Features Here’s a detailed look at the key specifications and updates that make the new XSR 155 stand out in the 150cc segment. Specification Details Engine...

Mumbai Metro Line 12 to Cut 45 Minutes from Your Daily Travel Time: Here’s What You Should Know

 

Mumbai Metro Line 12 to Cut 45 Minutes from Your Daily Travel Time: Here’s What You Should Know

Mumbai Metro Line 12, or the Kalyan-Taloja Metro Corridor, is designed to enhance connectivity across the Mumbai Metropolitan Region. Spanning 22.17 kilometers, this elevated route will connect Kalyan, a major suburban hub, with Taloja, an important industrial and residential area. The project, overseen by the Mumbai Metropolitan Region Development Authority (MMRDA), aims to offer quicker and more efficient travel, alleviating road and local train congestion.

Route Length: 22.17 kilometers
Number of Stations: 19
Connecting Areas: Kalyan, Dombivli, Taloja, and Kolegaon
Project Cost: Rs 5,865 crore
Daily Ridership Projection: 2.62 lakh by 2031-32; 2.94 lakh by 2041-42
Completion Target: December 2027

The MMRDA has started constructing pillars for this ambitious project, marking a major milestone. Slated to become operational by December 2027, the corridor will connect with Metro Line 5 (Orange Line) at Kalyan and Navi Mumbai Metro Line 1 at Taloja, facilitating smooth travel across the region.

Improved Commutes and Urban Development

Upon completion, Metro Line 12 will cut travel time between Kalyan, Dombivli, and Taloja by about 45 minutes. This will greatly benefit daily commuters, making Mumbai's public transportation more efficient, accessible, and sustainable. Additionally, the project is anticipated to drive urban development and foster regional economic growth.

Metro Line 12: Route Map and Stations

Metro Line 12, also known as the Kalyan-Taloja Metro Corridor, will feature 19 stations along its 22.17-kilometer route, connecting key areas such as Kalyan, Dombivli, Taloja, and Kolegaon. The line will provide seamless integration with other metro lines, enhancing connectivity across the Mumbai Metropolitan Region.

Note: For a detailed route map and stations, please refer to official sources like the MMRDA website or transport department.


Comments

Popular posts

Free Fire vs Call of Duty Mobile: Which Battle Royale Game Is Better in 2025?

Free Fire India Launch Date | Good News for Free Fire Players | When Will Free Fire Launch in India?

FSSAI Assistant Recruitment 2025: Online Application, Notification, Vacancies, Eligibility Criteria, and Deadline

MAH MCA and LLB CET 2025 Registration Begins at cetcell.mahacet.org – Apply Now!

RBI Changed CIBIL Score Rules – Big Relief for EMI and Loan Borrowers